The riverbank erosion and the lack of sediment transport was due to a dam for a ski intake pump. The result has been heavy erosion and sediment buildup. This project was designed using bioengineering and geomorphological methods to stabilize and enhance approximately 800 lineal feet of river. The restoration was achieved through the construction of bankfull benches and rock vanes. Step-pools were created and root wads installed to improve trout habitat. The riverbank stabilization was accomplished through sloping the river bank at a 2 to 1 ratio and by installing coconut fiber blankets. Finally, the area was planted with native riparian species. The long-term stabilization of this site will be achieved by re-establishing the riparian root system of the understory plant species. The river will now function correctly and move the correct amount of sediment during normal and storm flow events.
Services Offered: Stream Restoration Design, Permitting, Construction; Erosion Control Design and Installation
Before - Riverbank Erosion |
Before - River Unstable |
![]() Before - River Unstable |
Before - River Unstable |
Before - Riverbank Erosion |
Before- Riverbank Erosion |
|
Instream Pond for Ski Intake |
Dam for Ski Intake Pond |
|
Riverbank Erosion Due To Outlet Pipe |
Riverbank Stabilized |
|
River Stabilized Using Cross Vanes |
River Stabilized Using Cross Vanes |
|
River Stabilized Using J-Hook Vanes |
|